Construction Phase 2

These thermal pillars are mounted into the ready-made drilling hole with the aid of a wire rope hoist mounted on the drilling rig. The first section of the collector tube passes at the bottom end into a second section running alongside to the upper border of the terrain. This section is running helical around the first section.